Designed by: |
UNITEF´83 ZRt. |
Client: |
VEGYÉPSZER ZRt. |
Constructed by: |
PANNON GABION Kft. |
Constructed: |
March-April 2008 |
Construction period: |
20 days |
Retaining wall material: |
BETAFENCE welded mesh GABION |
Mesh: |
75 x 75 mm, wire thickness: 4.55 mm on the head panels and 3.00 mm elsewhere |
|
|
Anti-corrosion coating: |
zinc-alu. (95% Zn + 5% Al) |
Filling stone: |
100-250 mm grain size grey andesite |
Retaining wall length: |
539.00 m |
Retaining wall inclination angle: |
0 degree |
Retaining wall base thickness: |
1.00 m |
Retaining wall height: |
2.00 m |
Retaining wall volume: |
278 m³ |
|